Time Of Take-Off: 09:25 / Time Over Target: 11:14 / Time Landed: 13:05
48 A-26 aircraft loaded with 20x100LB General Purpose bombs were dispatched to attack an enemy Airfield at Plattling, Germany. Florine and crew in aircraft 585-L aborted over the airfield after take off because 1 bomb came loose from its shackle.
The Intelligence Annex which accompanied the Field Order states "This target is the airstrip at Plattling about 14 miles south-east of Straubing. During the last ten days the recce recorded great activity on this field. The number of aircraft varied from 12 to 49 from which 46 were single engine fighters. On one day, they reported at least one Me262. The nearby village of Mainkofen (U-786365) is being used as dispersal area, but the object of the bombing is to post hole the airstrip itself."
Fighter escort was again to be provided by 9th TAC. After rendezvous with their fighter escort the formation proceeded onward toward the target.
Weather conditions were 5 to 9/10 clouds over the target area.
No FLAK was encountered over the target area.
The lead Bombardier of the 1st box synchronized on wrong target and was trying to get indices on correct target when bombs went away. No bombs fell within 1000 ft of DMPI. Split concentration fell centered 1900 ft and 2700 ft NW of DMPI hitting along two main roadways, seven barracks type buildings, and twenty-two residential type buildings. 1 run. Results were judged as UNSATISFACTORY.
A poor target photo made it impossible for the lead Bombardier of the 2nd box to pick up DMPI. He chose a point in landing ground 1800 ft ENE of DMPI as SMPI. All bombs fell within 1000 ft of SMPI with zero feet radial error and all bombs in landing ground. 3 secondary roads in landing ground were also hit. 1 bombing run was made. Results were assessed as SUPERIOR.
Similarly, a poor target photo made it impossible for the lead Bombardier of the 3rd box to pick up DMPI. He also chose a point in landing ground 1800 ft ENE of DMPI as SMPI. Over 95 percent of bombs fell within 1000 ft of SMPI with zero feet radial error on SMPI and several hits on the W end of the runway and remainder of bombs in landing ground. 1 run made. Results were assessed as SUPERIOR.
Problems with the bomb release systems of the new A-26s continue to be reported at debriefing. One crew commented "2 bombs brought back, could not get rid of them."
With fighters at M-6642 at 8000 ft at zero plus 140 firing green flares.
Route Out:
base to F/R to U-7191 to U-9456 to tgt.
Route Back:
right to O-9803 to M-6642 to base.
Altitudes:
13000, minm alt 8000, lose 1000 ft after tgt.
Initial Point (IP):
0
Axis of Attack:
0
Emergency Airdromes:
3 acft from 344th GP will bomb 16 gun flak positions at U-77303480 21/2 min before main formation, bomb load 28x100 frag clusters desired interval 100 ft.
I. Bombs On: (primary-secondary-other-jettisoned-returned):
919-0-0-8-0 (100gp)(jettisoned: a/c 658 2x100gp at K-580665, hung up at target and later fell on bomb bay doors; a/c 190-V 2x100gp at U-080920 and 4x100gp at N280341, bombs hung up and on route back fell on bomb bay doors at two different times, would not salvo.)