An assignment to bomb the railroad bridge and embankment at Bourth, 25 miles east of Dreux, France, was the 391st Group's first for the month of August, the planes leaving base during the mid afternoon and returning at 1852 Hours. The target was a link for the German Ground Forces to Paris and the East.
Thirty-six planes were dispatched, and of these, five flights of six planes each, attacked the primary with varying results.
A late photo reconnaissance report on the same day revealed the following effects of the bombing through 7/10 cloud cover: "although this bridge remains undamaged, through traffic has been rendered impossible by a large crater on tracks East of the bridge. Approximately 30 craters are visible in the target area".
One flight bombardier failed to identify the primary on two runs and attacked a railroad junction in the vicinity. He reported excellent results accomplished with his flight's forty-eight 500-pound bombs.
There was no enemy opposition to the mission, and all the planes returned without damage or casualties.
ADDITIONAL INFORMATION FOR THIS MISSION FROM THE GROUP MISSION RECORDS IS AVAILABLE IN THE "CREW LOADLING LIST" SECTION OF THIS WEBSITE here