1st PATHFINDER SQUADRON (M) PROVISIONAL - OPREP (OPERATIONAL REPORT)

OPERATIONAL REPORT FOR OPREP NUMBER: 107

Index163
ReelA0856
Page1070
Form TypeForm34a
OpRep No.107
Subsection1
Mission Date30 Jun 1944
Mission No.69
Bomb Group
A/C No.
TargetConde Sur Noireau
Take-off PlaceRivenhall, Essex
Landing PlaceRivenhall, Essex
Take-off Time15:10:00
Time Over Target17:03:00
Landing Time18:25:00
Altitude11500-12500
Weather8-9/10
Bombing ResultsBox1, Nil; Box2, Unobserved.
Enemy OppositionNil
B1. A/C Dispatched2
B2. A/C Attacking1/PT
B3. A/C Abortive (weather-personnel-mechanical-other)0-0-0-1 (Equipment Failure)
B4. A/C MissingNil
B5. A/C Destroyed - Before TargetNil
B6. A/C Destroyed - Over & After TargetNil
B7. A/C DamagedNil
B8. A/C Sorties2
G. CasualtiesNil
H. E/A DamagedNil
Field Order (derived)404
Bomb Group Led (derived)397