1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 862

ReelA0860A
Page721
Date1945-04-19
Field Order862
X0
Paragraph#2
A/C#875
Call Sign Alpha
Call SignCQ
Answer As
Channel13
TargetULM MARSHALLING YARDS
Group Led322
PilotLT DEMOUCHE
NavLT CONWAY
BombLT WRIGHT
Section A [Time OBOE signal received?]15:48:00
Section B [Location OBOE signal received?]45 DEG 23 MIN N; 09 DEG 10 MIN E
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]SIGNALS GOOD BUT GROUP TOOK OVER FOR VISUAL RUN. 4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN ON DONAUWORTH. RESULTS GOOD.
Tracking_stationBAD HOMBURG
Releasing_stationMOLSHEIM
[A/C Serial]44-67875