1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 860

ReelA0860A
Page614
Date1945-04-18
Field Order860
X0
Paragraph#2
A/C#291
Call Sign Alpha
Call SignTO
Answer As
Channel11B
TargetNEUBERG OIL STORAGE
Group Led394
PilotLT CARRINGTON
NavLT ALLEN
BombCAPT HAILEY
Section A [Time OBOE signal received?]17:36:00
Section B [Location OBOE signal received?]49 DEG 18 MIN N; 13 DEG 33 MIN E
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]SIGNALS GOOD BUT GROUP TOOK OVER FOR VISUAL RUN AT WAITING POINT. 4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN. RESULTS GOOD. T.O.T. 1753.
Tracking_stationMOLSHEIM
Releasing_stationBAD HOMBURG
[A/C Serial]43-34291