1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 860

ReelA0860A
Page614
Date1945-04-18
Field Order860
X0
Paragraph#6
A/C#206
Call Sign Alpha
Call SignGI
Answer As
Channel13
TargetNEVIERS OIL STORAGE
Group Led410
PilotLT GIBBS
NavLT BREEDING
BombLT CALANNI
Section A [Time OBOE signal received?]18:17:00
Section B [Location OBOE signal received?]49 DEG 13 MIN N; 13 DEG
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]SIGNALS UNFLYABLE. GROUP TOOK OVER FOR VISUAL RUN. 4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN. RESULTS UNOBSERVED. T.O.T. 1844.
Tracking_stationMOLSHEIM.
Releasing_stationBAD HOMBURG
[A/C Serial]43-34206