1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 852

ReelA0860A
Page488
Date1945-04-15
Field Order852
X0
Paragraph#6
A/C#308
Call Sign Alpha
Call SignBF
Answer As
Channel13
TargetGUNZBURG MARSHALLING YARDS
Group Led410
PilotLT MATHIS
NavLT MILLER
BombLT GIBSON
Section A [Time OBOE signal received?]13:21:00
Section B [Location OBOE signal received?]48 DEG 11 MIN N; 09 DEG 25 MIN E
Section C [OBOE signal strength?]SIGNALS FAIR
RUNS1. RUN 1.
Point 'A' Time13:27:00
Point 'B' Time13:29:00
Point 'C' Time13:30:00
Point 'D' Time13:33:00
Release Point TimeNONE
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD AT BEGINNING OF RUN BUT FADED OUT TOWARDS END.
Section E [A/C heading, speed, and altitude?]NONE
Section F [Mech. Failures?]NONE
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED ON GEISINGEN BY NORDEN. RESULTS POOR. T.O.T. 1331.
Tracking_stationBAD HOMBURG
Releasing_stationMOLSHEIM
[A/C Serial]43-34308