1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 823

ReelA0860
Page1674
Date1945-03-28
Field Order823
X0
Paragraph#8
A/C#198
Call Sign Alpha
Call SignNO
Answer As
Channel11C
TargetEBRACH OIL STORAGE
Group Led397
PilotLT GIBBS
NavLT BREEDING
BombF/O CALANNI
Section A [Time OBOE signal received?]10:27:00
Section B [Location OBOE signal received?]49 DEG 35 MIN N; 09 DEG 47 MIN E
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]WEATHER CONDITIONS PREVENTED BOMBING OF PRIMARY TARGET. BOMBED CASUAL ALONE. 4 BY 5 HUNDRED LB GP BOMBS DROPPED. RESULTS UNOBSERVED.
Tracking_stationKEMPENICH
Releasing_stationHOLSHEIM
[A/C Serial]43-34198