1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 815

ReelA0860
Page1741
Date1945-03-24
Field Order815
X0
Paragraph#1
A/C#809
Call Sign Alpha
Call SignMP
Answer As
Channel11
TargetBORKEN COM. CENTER
Group Led410
PilotLT BOND
NavLT PAULE
BombLT BARRINGTON
Section A [Time OBOE signal received?]14:55:00
Section B [Location OBOE signal received?]52 DEG 10 MIN N; 06 DEG 35 MIN E
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]SIGNALS TOO NOISY AND GARBLED TO BE FLYABLE. GROUP TOOK OVER FOR VISUAL RUN. PFF A/C ABORTED AND BOMBED CASUAL TARGET AT HEIDEN (RA 445592) WITH GOOD RESULTS.
Tracking_stationTILBURG
Releasing_stationLAROCHE
[A/C Serial]44-67809