1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 753

ReelA0859
Page1610
Date1945-02-19
Field Order753
X0
Paragraph#4
A/C#579
Call Sign Alpha
Call SignHP
Answer As
Channel11B
TargetNIEDERSCHEID RAILROAD BRIDGE
Group Led387
PilotLT FITCH
NavLT GERMAIN
BombLT HETZEL
Section A [Time OBOE signal received?]14:13:00
Section B [Location OBOE signal received?]SW OF COBLENZ
Section C [OBOE signal strength?]SIGNALS POOR
RUNSRUN 1.
Point 'A' Time14:23:30
Point 'B' Time14:26:30
Point 'C' Time14:28:30
Point 'D' Time14:31:00
Release Point Time14:34:00
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]CAT SIGNALS GOOD. MOUSE POOR AND HARDLY AUDIBLE.
Section E [A/C heading, speed, and altitude?]NONE
Section F [Mech. Failures?]NONE
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED ON GROUP LEAD. FUZED 1/10 NOSE 1/40 TAIL. RESULTS UNOBSERVED.
Tracking_stationRIPS
Releasing_stationLAROCHE
[A/C Serial]42-107579