1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 748

ReelA0859
Page1276
Date1945-02-14
Field Order748
X0
Paragraph#6
A/C#722
Call Sign Alpha
Call SignNL
Answer As
Channel11B
TargetESCHWEILER ROAD JUNCTION
Group Led410
PilotLT FITCH
NavLT GERMAIN
BombLT HETZEL
Section A [Time OBOE signal received?]15:55:00
Section B [Location OBOE signal received?]15 MILES SW OF WAITING POINT
Section C [OBOE signal strength?]SIGNALS GOOD
RUNSRUN 1.
Point 'A' Time16:02:00
Point 'B' Time16:04:00
Point 'C' Time16:06:00
Point 'D' Time16:07:00
Release Point TimeNONE
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD. TURNED OF AT 1608
Section E [A/C heading, speed, and altitude?]NONE
Section F [Mech. Failures?]NONE
Section G [Results?]NO BOMBS DROPPED. GROUP WENT IN VISUALLY SO PFF ABORTED.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]41-31722