1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 746

ReelA0859
Page1219
Date1945-02-13
Field Order746
X0
Paragraph#12
A/C#916
Call Sign Alpha
Call SignNL
Answer As
Channel11B
TargetEUSKIRCHEN RAILROAD BRIDGE
Group Led344
PilotLT CARRINGTON
NavLT DALE
BombLT BARLOW
Section A [Time OBOE signal received?]12:00:00
Section B [Location OBOE signal received?]WAITING POINT
Section C [OBOE signal strength?]SIGNALS GOOD
RUNSRUN 1.
Point 'A' Time12:02:00
Point 'B' Time12:03:00
Point 'C' Time12:05:00
Point 'D' Time12:07:00
Release Point Time12:10:00
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD
Section E [A/C heading, speed, and altitude?]127 DEG 180 IAS 12,500 INDICATED ALTITUDE
Section F [Mech. Failures?]NONE
Section G [Results?]4 X 500 LB GP BOMBS DROPPED. FUZED 1/10 NOSE 1/40 TAIL. RESULTS UNOBSERVED. T.O.T. 1210.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]41-31916