BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 739
| Reel | A0859 |
| Page | 1033 |
| Date | 1945-02-09 |
| Field Order | 739 |
| X0 | |
| Paragraph# | 2 |
| A/C# | 811 |
| Call Sign Alpha | |
| Call Sign | TS |
| Answer As | |
| Channel | 12 |
| Target | KEMPEN COMMUNICATIONS CENTER |
| Group Led | 416 |
| Pilot | LT FITCH |
| Nav | LT GERMAIN |
| Bomb | LT HETZEL |
| Section A [Time OBOE signal received?] | 14:23:00 |
| Section B [Location OBOE signal received?] | 51 DEG 35 MIN N ; 05 DEG 10 MIN E |
| Section C [OBOE signal strength?] | NO SIGNALS |
| RUNS | |
| Point 'A' Time | |
| Point 'B' Time | |
| Point 'C' Time | |
| Point 'D' Time | |
| Release Point Time | |
| Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?] | |
| Section E [A/C heading, speed, and altitude?] | |
| Section F [Mech. Failures?] | |
| Section G [Results?] | BOTH MI AND GEE EQUIPMENT SHORTED OUT SO IMPOSSIBLE TO DRO EITHER. PFF ABORTED AND GROUP WENT BACK TO TRY ANOTHER RUN ON NORDEN. |
| Tracking_station | FLORENNES |
| Releasing_station | GEE |
| [A/C Serial] | 44-67811 |