1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 736

ReelA0859
Page843
Date1945-02-06
Field Order736
X0
Paragraph#8
A/C#875
Call Sign Alpha
Call SignCQ
Answer As
Channel13
TargetBERG/GLADBACH STORAGE AND REPAIR DEPOT
Group Led391
PilotLT MCALPIN
NavCAPT MEINKE
BombLT YOKLEY
Section A [Time OBOE signal received?]
Section B [Location OBOE signal received?]
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]NAVIGATOR TURNED OFF EQUIPMENT AT BEGINNING OF RUN AND MADE RUN ON GEE DUE TO WEATHER. 4 BY 5 HUNDRED LB BOMBS DROPPED ON OBERSTEIN ( 50 DEG 42 MIN N ; 07 DEG 20 M E. ) RESULTS UNOBSERVED.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]44-67875