BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 731
| Reel | A0859 |
| Page | 775 |
| Date | 1945-02-03 |
| Field Order | 731 |
| X0 | |
| Paragraph# | 2 |
| A/C# | 321 |
| Call Sign Alpha | |
| Call Sign | KP |
| Answer As | |
| Channel | 12 |
| Target | AHRWEILER RAILROAD BRIDGE |
| Group Led | 397 |
| Pilot | LT DUBOIS |
| Nav | LT VANAKEN |
| Bomb | LT BOETTCHER |
| Section A [Time OBOE signal received?] | 13:48:00 |
| Section B [Location OBOE signal received?] | 49 DEG 49 MIN N ; 06 DEG 57 MIN E |
| Section C [OBOE signal strength?] | |
| RUNS | |
| Point 'A' Time | |
| Point 'B' Time | |
| Point 'C' Time | |
| Point 'D' Time | |
| Release Point Time | |
| Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?] | |
| Section E [A/C heading, speed, and altitude?] | |
| Section F [Mech. Failures?] | |
| Section G [Results?] | SIGNAL WERE WEAK AND UNINTELLIGIBLE ALL DOWN RUN. BOMBARDIER OPENED DOORS ON GEE FIX AND PILOT HELD COURSE ON GEE.N RELEASE SIGNAL SO WEAK BOMBARDIER UNA TO HEAR IT. 4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN AND GEE FIX. FUZED 1/10 NOSE 1/40 TAIL. RESULTS FAIR. |
| Tracking_station | FLORENNES |
| Releasing_station | RIPS |
| [A/C Serial] | 43-34321 |