1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 731

ReelA0859
Page775
Date1945-02-03
Field Order731
X0
Paragraph#2
A/C#321
Call Sign Alpha
Call SignKP
Answer As
Channel12
TargetAHRWEILER RAILROAD BRIDGE
Group Led397
PilotLT DUBOIS
NavLT VANAKEN
BombLT BOETTCHER
Section A [Time OBOE signal received?]13:48:00
Section B [Location OBOE signal received?]49 DEG 49 MIN N ; 06 DEG 57 MIN E
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]SIGNAL WERE WEAK AND UNINTELLIGIBLE ALL DOWN RUN. BOMBARDIER OPENED DOORS ON GEE FIX AND PILOT HELD COURSE ON GEE.N RELEASE SIGNAL SO WEAK BOMBARDIER UNA TO HEAR IT. 4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN AND GEE FIX. FUZED 1/10 NOSE 1/40 TAIL. RESULTS FAIR.
Tracking_stationFLORENNES
Releasing_stationRIPS
[A/C Serial]43-34321