1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 731

ReelA0859
Page775
Date1945-02-03
Field Order731
X0
Paragraph#8
A/C#308
Call Sign Alpha
Call SignBF
Answer As
Channel13
TargetBERG/GLADBACH REPAR DEPOT
Group Led323
PilotCAPT JONES
NavLT LEBOEUF
BombLT RIZZO
Section A [Time OBOE signal received?]14:40:00
Section B [Location OBOE signal received?]50 DEG 35 MIN N ; 07 DEG 50 MIN E
Section C [OBOE signal strength?]SIGNALS GOOD
RUNSRUN 1.
Point 'A' Time14:48:30
Point 'B' Time14:51:00
Point 'C' Time14:53:00
Point 'D' Time14:56:30
Release Point Time14:57:00
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD DOWN THROUGH " D " WHEN NOISE BECAME APPARENT. WAS NOT ENOUGH TO DISTORT SIGNALS
Section E [A/C heading, speed, and altitude?]300 DEG 185 IAS 13,500 INDICATED ALTITUDE
Section F [Mech. Failures?]NONE
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED. FUZED 1/10 NOSE 1/40 TAIL. RESULTS UNOBSERVED. T.O.T. 1457.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]43-34308