1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 730

ReelA0859
Page707
Date1945-02-02
Field Order730
X0
Paragraph#9
A/C#872
Call Sign Alpha
Call SignCQ
Answer As
Channel13
TargetROSBACH RAILROAD BRIDGE
Group Led397
PilotLT MILLER
NavLT DALE
BombLT MADSEN
Section A [Time OBOE signal received?]11:25:00
Section B [Location OBOE signal received?]9 35.5 GEE FIX RHEIMS CHAIN.
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED VISUALLY ON SECONDARY TARGET AT WF 3523. RESULTS UNOBSERVED.
Tracking_stationFLORENNES
Releasing_stationRIPS
[A/C Serial]44-67875