1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 730

ReelA0859
Page707
Date1945-02-02
Field Order730
X0
Paragraph#7
A/C#407
Call Sign Alpha
Call Sign*BU
Answer As*RG
Channel11
TargetOBER VILKERATH RAILROAD BRIDGE
Group Led394
PilotLT FITCH
NavLT GERMAIN
BombLT HETZEL
Section A [Time OBOE signal received?]11:15:00
Section B [Location OBOE signal received?]50 DEG 12 MIN N ; 07 DEG 51 MIN E
Section C [OBOE signal strength?]SIGNALS
RUNSRUN 1.
Point 'A' Time11:29:00
Point 'B' Time33:00.00
Point 'C' Time1135
Point 'D' Time11:36:30
Release Point TimeNONE
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD. TX OFF AFTER " D ".
Section E [A/C heading, speed, and altitude?]NONE
Section F [Mech. Failures?]NONE
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED ON NORDEN ON CASUAL TARGET AT WF 855455. FUZED 1/10 NOSE 1/40 TAIL. GROUP LEADING. RESULTS UNOBSERVED.
Tracking_stationFLORENNES
Releasing_stationRIPS
[A/C Serial]41-31668