1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 728

ReelA0859
Page598
Date1945-02-01
Field Order728
X0
Paragraph#1
A/C#916
Call Sign Alpha
Call Sign*CL
Answer As*NL
Channel11B
TargetSCHLEIDEN DEFENDED VILLAGE
Group Led416
PilotLT NICHOLS
NavLT VANAKEN
BombLT VANDERMAY
Section A [Time OBOE signal received?]15:20:00
Section B [Location OBOE signal received?]50 DEG 36 MIN N ; 05 DEG 39 MIN E
Section C [OBOE signal strength?]SIGNALS GOOD
RUNSRUN 1.
Point 'A' Time15:21:00
Point 'B' Time15:23:00
Point 'C' Time15:25:00
Point 'D' Time15:27:00
Release Point Time15:30:00
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD
Section E [A/C heading, speed, and altitude?]130 DEG 195 IAS 12,500 INDICATED ALTITUDE
Section F [Mech. Failures?]NONE.
Section G [Results?]4 BY 5 HUNDRED LB GP BOMBS DROPPED. FUZED 1/10 NOSE 1/40 TAIL. RESULTS FAIR. T.O.T. 1530.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]41-31722