1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 720

ReelA0858
Page2153
Date1945-01-25
Field Order720
X0
Paragraph#7
A/C#579
Call Sign AlphaHARRY PETER
Call SignHP
Answer As
Channel11B
TargetEUSKIRCHEN RAILROAD BRIDGE
Group Led391
PilotLT BARTELS
NavLT CARLS
BombLT LEVIN
Section A [Time OBOE signal received?]
Section B [Location OBOE signal received?]
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]GROUP TOOK LEAD AT IP AND BOMBED VISUALLY. A/C WENT TO 5 MILES OF BOMB LINE THEN ABORTED. TX NEVER TURNED ON. NO BOMBS DROPPED.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]42-107579