1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 715

ReelA0858
Page2155
Date1945-01-22
Field Order715
X0
Paragraph#11
A/C#201
Call Sign AlphaCHARLIE MOTHER
Call SignCM
Answer As
Channel11B
TargetSIMMERN RAILROAD BRIDGE
Group Led409
PilotLT DUBOIS
NavLT ROBBINS
BombLT BOETTCHER
Section A [Time OBOE signal received?]
Section B [Location OBOE signal received?]
Section C [OBOE signal strength?]
RUNS
Point 'A' Time
Point 'B' Time
Point 'C' Time
Point 'D' Time
Release Point Time
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]
Section E [A/C heading, speed, and altitude?]
Section F [Mech. Failures?]
Section G [Results?]DETAILED REPORT UNAVAILABLE. SIGNALS GOOD. DROPPED FOUR BY FIVE HUNDRED LB GP BOMBS ON EQUIPMENT. RESULTS UNOBSERVED. T.O.T. 1331. HEADING AT RELEASE 335 DEG. 193 I A S. 13,200 INDICATED ALTITUDE. A/C CRASHED BEFORE RETURNING TO BASE. NAV AND ENGINEER GUNNER KIA.
Tracking_stationCOMMERCY
Releasing_stationFLORENNES
[A/C Serial]43-34201