1st PATHFINDER SQUADRON (M) PROVISIONAL - OBOE REPORT

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 706

ReelA0858
Page1958
Date1945-01-13
Field Order706
X0
Paragraph#3
A/C#722
Call Sign AlphaCHARLIE LOVE
Call SignCL
Answer As
Channel11B
TargetDASBURG RAILROAD BRIDGE
Group Led397
PilotLT MARKOT
NavCAPT LEFEBER
BombLT HOENSCHEL
Section A [Time OBOE signal received?]12:55:00
Section B [Location OBOE signal received?]49 DEG 127 MIN N O5 DEG 32 MIN E
Section C [OBOE signal strength?]SIGNALS GOOD
RUNS1 RUN 1
Point 'A' Time
Point 'B' Time13:11:00
Point 'C' Time13:12:30
Point 'D' Time13:15:00
Release Point Time13:18:00
Section D [OBOE Tracking (Cat) and Releasing (Mouse) description ?]BOTH CAT AND MOUSE SIGNALS GOOD.
Section E [A/C heading, speed, and altitude?]31 DEG; 185 IAS; 12,500 INDICATED ALTITUDE
Section F [Mech. Failures?]
Section G [Results?]FOUR BY FIVE HUNDRED LB GP BOMBS DROPPED. FUZED 1/10 NOSE 1/40 TAIL. RESULTS UNOBSERVED.
Tracking_stationFLORENNES
Releasing_stationRIPS
[A/C Serial]41-31722