1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 838

ReelA0860a
Page405
Subsection
Field Order838
A. Order Form No.339B#JJ1
B. IntentionJJ1
C. TargetMORTHEIM M/Y MAP GSGS4414 SHEET 4225AND 4325-5535:4660 ACCURACY B
D. Target Altitude (Feet)AIRCRAFT WILL BE CALLED 15 MINUTES BEFORE TIME OVER TARGET
E. Zero Hour
F. Releasing StationKEMPENICH
G. Tracking StationRIPS
H. Direction Of Run (Degrees)
J. Waiting Point5116n0957e
K. Position A
PA. Call SignOK[Channel-12]
PB. Time Over TargetZERO+1
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)147500
T. Estimated Wind Direction
UA. Bomb Loading Type5
UB. Intervalometer Setting
UC. Aiming Point5143n1000e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info
ZD. Target Order