1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 806

ReelA0860
Page1381
Subsection
Field Order806
A. Order Form No.309D#KK2
B. IntentionKK2
C. TargetDULMEN COMMUNICATION CENTER MAP GSGS4414 SHEET 4109-6845:5920
D. Target Altitude (Feet)
E. Zero Hour
F. Releasing StationRIPS
G. Tracking StationLAROCHE
H. Direction Of Run (Degrees)
J. Waiting Point5203n0631e
K. Position A
PA. Call SignRA[Channel-13]
PB. Time Over TargetZERO+11
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)12000
T. Estimated Wind Direction
UA. Bomb Loading Type7
UB. Intervalometer Setting
UC. Aiming Point5149n0718e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info309D#BB
ZD. Target Order