1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 788

ReelA0860
Page353
Subsection
Field Order788
A. Order Form No.294A#HH2
B. IntentionHH2
C. TargetSYTHEN AMMO FILLING PLANT MAP GSGS4414 SHEET 4209-6300:5500 ACCURACY B
D. Target Altitude (Feet)60 METERS
E. Zero Hour
F. Releasing StationTILBURG
G. Tracking StationLAROCHE
H. Direction Of Run (Degrees)
J. Waiting Point5159n0630e
K. Position A
PA. Call SignUT[Channel-11c]
PB. Time Over TargetZERO+31
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)12000
T. Estimated Wind Direction
UA. Bomb Loading Type3
UB. Intervalometer Setting
UC. Aiming Point5146n0715e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info294A#BB
ZD. Target Order