1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 788

ReelA0860
Page353
Subsection
Field Order788
A. Order Form No.294D#JJ1
B. IntentionJJ1
C. TargetGESKE M/Y MAP GSGS4414 SHEET 4317-5340:3900 ACCURACY B
D. Target Altitude (Feet)102 METERS
E. Zero Hour
F. Releasing StationLAROCHE
G. Tracking StationRIPS
H. Direction Of Run (Degrees)
J. Waiting Point5112n0828e
K. Position A
PA. Call SignHE[Channel-12]
PB. Time Over TargetZERO+40
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)13500
T. Estimated Wind Direction
UA. Bomb Loading Type5
UB. Intervalometer Setting
UC. Aiming Point5138n0831e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info294D#BB
ZD. Target Order