1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 787

ReelA0860
Page415
Subsection
Field Order787
A. Order Form No.293H#KK1
B. IntentionKK1
C. TargetLORCH SIDING MAP GSGS4414 SHEET 5912-0566:6000 ACCURACY B
D. Target Altitude (Feet)115 METERS
E. Zero Hour
F. Releasing StationLAROCHE
G. Tracking StationCOMMERCY
H. Direction Of Run (Degrees)
J. Waiting Point5022n0714e
K. Position A
PA. Call SignUS[Channel-13]
PB. Time Over TargetZERO+61
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)13000
T. Estimated Wind Direction
UA. Bomb Loading Type5
UB. Intervalometer Setting
UC. Aiming Point5003n0749e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info293H#BB
ZD. Target Order