1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 747

ReelA0859
Page1297
Subsection
Field Order747
A. Order Form No.251B
B. IntentionKK1
C. TargetMECHERNICH REPAIR CENTER MAP GSGS 4414 SHEET 5405-223:210 ACCURACY C
D. Target Altitude (Feet)
E. Zero Hour
F. Releasing StationFLORENNES
G. Tracking StationCOMMERCY
H. Direction Of Run (Degrees)
J. Waiting Point5042n0550e
K. Position A
PA. Call SignCQ[Channel-13]
PB. Time Over TargetZERO+0
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)13500
T. Estimated Wind Direction
UA. Bomb Loading Type
UB. Intervalometer Setting50
UC. Aiming Point5035n0639e
W. Position A/B/C/D (Minutes)
X. Special Instructions300 METERS
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info
ZD. Target Order