1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 724

ReelA0858a
Page271
Subsection14
Field Order724
A. Order Form No.#233H
B. IntentionKK1
C. TargetRHEINBACH DEFENDED VILLAGE GSGS 4414 SHEET 5307-4445:2554 ACCURACY C
D. Target Altitude (Feet)
E. Zero Hour
F. Releasing StationRIPS
G. Tracking StationFLORENNES
H. Direction Of Run (Degrees)
J. Waiting Point5012n0702e
K. Position A
PA. Call SignHP*[Channel-13]
PB. Time Over TargetZERO+65
Q. Estimated True Air Speed
R. True Altitude Above MSL (feet)12500
T. Estimated Wind Direction
UA. Bomb Loading Type
UB. Intervalometer Setting30
UC. Aiming Point5037n0658e
W. Position A/B/C/D (Minutes)
X. Special Instructions
ZA. Group Annotated
ZB. Pilot Annotated
ZC. Bombing Info
ZD. Target Order