1st PATHFINDER SQUADRON (M) PROVISIONAL - FIELD ORDER (OBOE)

BOMBING AND OBOE DETAILS FOR FIELD ORDER NUMBER: 501

ReelA0857
Page1467
Subsection7
Field Order501
A. Order Form No.17/1000b. #77. annex#1
B. Intention[blank]
C. TargetLe Bourg 4900/81 044045
D. Target Altitude (Feet)264
E. Zero Hour17/1400b
F. Releasing StationTilly Whim
G. Tracking StationBeachy Head
H. Direction Of Run (Degrees)85
J. Waiting Point4906n0000e
K. Position A4906n0000e
PA. Call SignBU-CHANNEL13
PB. Time Over TargetZERO+35
Q. Estimated True Air Speed220 mph
R. True Altitude Above MSL (feet)12000
T. Estimated Wind Direction255 at 24 mph
UA. Bomb Loading Type4x1000gp
UB. Intervalometer Setting30 feet
UC. Aiming PointFirst bomb to hit center of target.
W. Position A/B/C/D (Minutes)9/7/5/3
X. Special Instructions
ZA. Group Annotated322
ZB. Pilot Annotated
ZC. Bombing Info
ZD. Target Order1